Ciudad Real Biosanitary Campus WINNING PROJECT

Valencia, Spain 2021 18.729 m2

The Biosanitary Campus, an enclave dedicated to medicine and biomedical research, is located on a plot of land strategically situated in the surroundings of the General University Hospital of Ciudad Real. This academic centre is located to the southwest of Larache, in the Nuevo Hospital neighbourhood, completing the consolidated urban area.

Surrounded by residential buildings and areas for sports and health facilities, the plot establishes a harmonious link with its surroundings. To the east, it establishes a close functional connection with the Hospital, serving as the epicentre of the synergy between education and health. The extensively landscaped General Espartero street becomes the connector between the two complexes, linking with the Targoviste park to the north and the General Espartero square to the south.

The Biosanitary Campus is conceived as a dynamic complex that harmonises with nature and biodiversity, improving the quality of life of users and providing spaces for connection and growth.

SUSTAINABILITY

The proposal seeks to construct buildings with a reduced carbon footprint during their life cycle. To this end, bioclimatic design strategies will be implemented to minimise energy demand, optimise design and material selection, and install solar photovoltaic energy. The aim is to achieve ZEB (Zero Energy Building) status for energy consumption and ZCB (Zero Carbon Building) for carbon emissions, which will bring environmental, economic and social benefits.

SHAPING THE CAMPUS: ARCHITECTURAL STRATEGY FOR AN ACADEMIC CITY

The Campus encompasses a plurality of academic uses and biomedical research facilities. Although each component has its own programmatic identity, they all converge in an appropriate interconnection that promotes interdisciplinary collaboration.

In compositional terms, the campus fits into the urban scheme and integrates harmoniously into the residential environment of the adjacent blocks.

The fragmentation of the buildings on an endowment scale, and the careful consideration of full and empty spaces is adapted to the neighbourhood level, with appropriate aesthetics and respecting building heights and street widths.

A SQUARE AS A GATEWAY TO THE CAMPUS

From the urban perspective, the design of the Campus is oriented towards the extension of walkways and green areas, configuring a large urban square as the main access.

The layout of the square follows the development of the street General Espartero as an open, green space, linking with the promenades and gardens of this street and facilitating traffic interactions with the Hospital.

This vegetated square not only seeks to provide bioclimatic comfort, but also stands as an imposing entrance to the Campus, defining its presence in the urban fabric.

A STREET AS THE ENTRANCE HALL OF THE COMPLEX

The layout of the buildings follows the internal logic of an academic community. The presence of a semi-open lobby, a sort of “main street”, brings the buildings of the complex together.

This non-air-conditioned space provides environmental quality and is the beating heart of the academic life of the Campus, a meeting point where innovation and education converge.

RELATIONSHIP WITH THE ENVIRONMENT

The architecture of the complex is also conceived according to the scale of the University Campus, ensuring that the General Services buildings are presented as volumes that, as a prominent entrance gate, welcome visitors.

As for the colour palette, the complex blends in with its surroundings by reflecting the combination of earthy and light tones present in the nearby buildings, especially in the neighbouring Hospital. The integration of the Campus also stands out for its choice of vegetation, adopting species typical of the local environment.

INTERNAL FUNCTIONAL RELATIONSHIP

The general layout of the buildings on the plot follows an efficient distribution pattern, adopting the shape of a comb oriented from north to south. The buildings dedicated to Teaching and Research are located in this arrangement, while the buildings for general services are located perpendicularly, acting as a boundary with the access plaza and orienting their public functions towards the plaza and the connecting street or foyer.

The sequence of buildings in a north-south direction includes the Faculty of Medicine and Pharmacy, Teaching Laboratories and LHCS, the Institute of Biomedical Research and Animal Facility, and the Institute of Legal Medicine and Forensic Sciences of Ciudad Real to the south, closing the Campus. This organisation allows for the creation of independent accesses to the complex, not limited to the main entrance, and facilitates restricted accesses from Diego de Mazariegos street for supplies to the buildings.

The buildings are distinguished by their simple and functional design, following an organisational scheme that maximises natural light and appropriate relationships between service and served spaces. They are also highly flexible and adaptable to programmatic redistributions.

In general terms, in each building, areas of continuous use, such as classrooms or laboratories, are located to the north to take advantage of diffuse light, while offices or rooms for intermittent use are located to the south. The central body of the building is used for communications, toilets, corridors, storage and other service areas.

 

Winning proposal of the contest for the development of the project for the Biosanitary Campus of Ciudad Real for the University of Castilla-La Mancha (Spain). The project is co-financed with FEDER funds from the operational programme 20-21/27 and with funds from the Junta de Comunidades de Castilla la Mancha.

  • Architect

    Ramón Esteve

  • Collaborating Architects

    Anna Boscà

    Beatriz Martín

    Beatriz Gascón

    Paco Olcina

    Simona Herchlová

    Lola Sánchez

  • REE Image Collaborators

    Tudi Soriano

    Guido Bolognini

  • Technical Architects

    Emilio Pérez

    Sergio Cremades

  • BIM

    Ruth Lizondo

    Didac Borda Cucó (externo)

  • Industrial and Structural Engineering

    Socotec Ingeniería

     

     

  • Security and Health Engineering

    Inminer Ingeniería

  • Engineer Expert in Animal Research Facilities

    Juan Pedro Jiménez

     

  • Client

    Universidad Castilla la Mancha

     

  • Start Year of Construction

    2024